SFPPN - New Stacker-Reclaimer

Sept-Îles, (Quebec, Canada)
Integrated work: Construction

DAWCO was mandated to assemble the electrical components on sections of the new stacker, which will be used to load and unload ore from various mines.

 

More specifically, the scope of works included:

 

  • Panel and PLC installation
  • Installation of cable trays
  • Installation and connection of 600V and 25kV control cables
  • Installation of various equipment and instruments
  • Installation of a lightning conductor system
  • Installation of fiber optic communication network
  • Installation of camera system
  • Commissioning