Newington Energy – Thermal power plant with cogeneration (550MW)
Newington, (Connecticut, United States)
Integrated work: Construction
Share
DAWCO’s mandate was to complete electrical works and install instrumentation for the construction of two (2) gas turbines (GE) and one (1) vapor turbine (Toshiba), and for the entire power station. DAWCO installed and calibrated approximately 3000 instruments.