St-Hubert-Longueuil (Quebec, Canada)
Integrated work: BIM Electrical construction
DAWCO has been awarded an electrical construction mandate for the construction of the new Molson brewery.
The scope of work in design-build mode ranges from 25KV distribution outside, an independent 12-cell substations, to power transformers located on the mezzanine of the main part of the building.
The secondary distributions, distributed in the various buildings, are supplied at 480V over very long distances. The mandate also includes services for the factory and offices, auxiliary services such as the telecom and fire alarm system as well as mechanical services.