St-Eustache, (Quebec, Canada)
Integrated work: Construction
DAWCO was mandated to install a continuous flow production line for the manufacture of non-woven fabrics for medical use.
More specifically, the scope of work included:
Pre-fabrication and installation of process piping (mainly 304 L grade stainless steel)
Installation of thermal insulation
Installation of electrical and instrumentation systems
Installation of the ventilation and dust collection systems.