Hydro-Québec – Poste Bélanger

Montreal, (Quebec, Canada)
Integrated work: Maintenance
In order to better meet electricity needs, particularly in the east of Montreal, Hydro-Quebec is replacing existing facilities. Siemens Canada Limited hired DAWCO to install a 315KV sub-station for a Gas Insulated Switchgear (GIS) using SF6 gas. Siemens Canada Limited supplied the equipment to be installed and the necessary material (supports, gateways, wiring, panels and grounding) to accomplish the mandate. The project began with the delivery of over 250 wooden crates from overseas containing many parts and materials. Most of the crates were delivered to the Port of Montreal by ship, after which they were transported to the Bélanger Station. Each crate was placed in a specific area and was numbered to efficiently track work. Opened one at a time, all the parts were inspected before proceeding with assembly and installation.

Contact us

Personal information

Latest project