This project consisted in the complete construction, from the concrete bases to the mechanical installation of equipment, of a 43m diameter thickener, a 25m diameter water tank, a pump house building and a piperack that connects to the concentrator sector of the Mount Wright Iron Mining Complex in Fermont, Québec.