DAWCO has been awarded a mandate to perform electrical installation work at Fives as part of the renovation of a 60 ton overhead crane. The scope of work involved: Change of equipment on the overhead crane, Renewal of the electrical system, and Change of the whole control system. The work lasted one month and required the intervention of a team of eight (8) electricians.